That amount of water could fill approximately
—
Olympic swimming pools
One Olympic pool holds about 660,430 gallons (50 × 25 × 2 m). Approximate.
How thirsty is AI?
Watch it live
Estimated water consumed by data centers since 2024
Gallons
Today
—
est. gal
This hour
—
est. gal
This minute
—
est. gal
Per second
—
est. gal
A live estimate from published data — not a physical meter on every data center.
Put that into perspective
Most of us don’t think in hundreds of billions of gallons. These are approximate translations of the live water counter — they rise with it.
That amount of water could fill approximately
—
Olympic swimming pools
One Olympic pool holds about 660,430 gallons (50 × 25 × 2 m). Approximate.
Equivalent to approximately
—
U.S. household water-use days
EPA typical household use of 300 gallons per day. Approximate.
Enough water to fill
—
bathtubs
A typical filled bathtub holds about 40 gallons. Approximate.
Or about
—
tanker-truck loads
A typical tanker payload of 11,000 gallons. Approximate.
Equivalent to approximately — Olympic swimming pools filled since January 1, 2024.
Today
—
Since local midnight
This month
—
Since the 1st
This year
—
Since January 1
Per day
—
Current-year rate
Per hour
—
Current-year rate
Per minute
—
Current-year rate
Per second
—
Current-year rate
AI’s growing thirst
Estimated annual totals from the growth model. Water is the default. Years after the current one are projected — not measured.
Annual gal
207.84 billion
Average / day
569.42 million
Average / hour
23.73 million
Average / second
6.59 thousand
Growth vs prior year
+12.0%
Data center water by company
These are on-site figures from environmental reports. They do not include water used to generate electricity, and they do not sum to the global clock.
10.9 billion
consumed · 2025
Company-wide; data centers drove most of the increase
Up 34% year over year. 2024 data-center consumption was 7.79 billion gallons (Google 2025 Environmental Report).
Google 2026 Environmental Report
2.7 billion
withdrawn · 2024
Company operations (not data-center-only)
Fleet WUE reported at 0.27 L/kWh in FY2025. Microsoft stated it reached a water-positive position in FY2025.
Microsoft environmental disclosures, FY2024
2.5 billion
withdrawn · 2025
AWS data centers, global
First absolute disclosure. Global WUE reported at 0.12 L/kWh.
AWS water disclosure, June 2026
1.49 billion
used · 2024
Owned sites (leased and construction water reported separately)
5,637 megaliters in 2024, up from 3,726 megaliters in 2020. Construction withdrawals are excluded from this figure.
Meta 2025 Environmental Data Index
34.37 billion
used · 2026
Enterprise, colocation, China, and remaining hyperscale — on-site water only, estimated
Most of the world’s data-center water is not in the four U.S. hyperscalers’ reports. This card is an order-of-magnitude residual, not a measurement.
Residual of IEA-derived global direct water minus disclosed hyperscale on-site totals
The thirst expands
Today the story is water. The same model can carry energy, carbon, and capacity without a redesign — quiet estimates, not competing clocks.
Hero clock
—
gal since 2024
—
Estimated
—
kWh since 2024
—
Estimated
—
metric tons since 2024
—
Estimated load
—
MW operating load
How do we know?
AI THIRST does not directly measure every data center in real time. The live counter is an estimate derived from published research, company disclosures, government information and industry data. Published consumption estimates are converted into an estimated consumption rate to power the live counter.
View our sourcesActual reported data
Estimated / projected data
Each calendar year is converted to a per-second rate using the actual length of that year, including leap days in 2024 and 2028:
annual total ÷ days in year ÷ 24 ÷ 60 ÷ 60 = units per second
The display is the integral of those rates from 1 January 2024, 00:00 UTC to now. Reloading the page does not reset it. 2026 water currently runs at about 6,591 gallons per second. Electricity 2026 is about 558 TWh for the full year.
View our sources
Every citation below is a real publication. Where a global total has not been measured, this site says so and uses an estimate.
International Energy Agency · 2025
Headline global figure: 560 billion liters of data-center water in 2023 (140 direct, 373 indirect, 47 embodied). Outlook of roughly 1,200 billion liters by 2030 is cited in contemporaneous IEA-based reporting.
International Energy Agency · 2026
Electricity consumption from data centres grew ~17% in 2025 to about 485 TWh (from ~415 TWh in 2024). Updated outlook: roughly 950 TWh in 2030. AI THIRST’s electricity and operating-load estimates are built from these figures.
Lawrence Berkeley National Laboratory / U.S. Department of Energy · 2024
U.S. data centers consumed 17.4 billion gallons of water on-site in 2023, plus about 211 billion gallons indirectly through electricity generation. 2028 on-site range: 38–73 billion gallons.
Google · 2025–2026
2024 data-center water: 9.87 billion gallons withdrawn, 7.79 billion gallons consumed. 2025 company-wide consumption: 10.9 billion gallons (+34%).
Microsoft · 2024–2025
Approximately 2.7 billion gallons withdrawn in 2024 (company operations). Fleet WUE 0.27 L/kWh in FY2025.
Amazon Web Services · 2026
First absolute figure: 2.5 billion gallons withdrawn by AWS data centers in 2025. Global WUE 0.12 L/kWh.
Meta · 2025
Water use rose from 3,726 megaliters in 2020 to 5,637 megaliters in 2024. Meta also discloses water embedded in purchased electricity, which is several times on-site use.